Finish this statement: Rehab is not for everyone. You must consider your ________, family and purpose. If these are not in __________your business will have success but fall short of its __________________.
What things should consider while creating your business plan: 1._________________________________________________________________________
2._________________________________________________________________________
3. _________________________________________________________________________
Why are you considering this journey? 1._________________________________________________________________________
2. _________________________________________________________________________ 3._________________________________________________________________________
How to get pre-qualified for a loan? 1._________________________________________________________________________
2. _________________________________________________________________________ 3._________________________________________________________________________
What step am I missing?
- Develop Scope of Work for the project.
- Schedule walk through with each sub/contractor walk-thru of the project site.
- ___________________________________________________________________
- Value engineering used to determine if the existing floor plan and the site plan
- Values are assigned to each task creating a budget
- Review all proposals
- Sign a contract with tradesman
- Develop schedule
- Send signed contracts to all tradesmen along with floor plans, scope of work and schedule
- ___________________________________________________________________
- ___________________________________________________________________
- Work starts once all permits have been secured
- Deploy demo team
- Call lumber representative and place orders for framing (only order 1 floor at a time)
- Two weeks before framing is complete schedule the HVAC trades
- ___________________________________________________________________
- Within a week of Plumbing rough-in completion call to schedule electrician
- Call regional housing department for all water mains, gas meters and electric service
- Once all tradesmen have finished and received their inspection certificates, call local housing department to schedule the framing inspection before 2:30p to have it done the next day.
- Order insulation and dry wall materials the same day you call for framing inspection
- Once you receive the framing certificate, install insulation
- ___________________________________________________________________
- Call and schedule alarm trade for the next day
- Day of insulation inspection call for next day dry wall hanging
- While dry wall is being hung call lumber rep to come out and measure for trim/door and baseboard
- Order cabinets
- ___________________________________________________________________
- Install trim
- Paint
- Call all tradesmen to complete finishes
- ___________________________________________________________________
- Call wrought iron fabricator to complete measurements of stairs and provide measurements for AC condenser.
- Order flooring/Delivery completed same day (must remain in house for 48 hours before install)
- Install floors
- Install cabinets
- Tradesmen should all be complete
- Final inspection for trades
- ___________________________________________________________________
- Cleaning
- Walk-thru
- Walk through and develop a punch list
What documents are required from Contractors? 1.______________________________________________________________________
2.______________________________________________________________________
3.______________________________________________________________________
When should I hire a realtor?
1.______________________________________________________________________
2. _________________________________________________________________________ 3._________________________________________________________________________
Create a Front end using the formulas in the course:
Create a backend deal using the formulas in the course:
Create a 20-30% deal using the formulas in the course:
Depending on the size of your project, for example, to rehab a 1000 square foot house, it should take your tradesman approximately 3-4 months. Keep in mind this depends on a few factors. What are those factors? Complete the missing steps:
1. Is this a custom rehab?
2. ____________________
3. Inspection lead time
4. ________ ______________
5. Schedule I will self-manage the rehab project?